How Long Does It Take to Replace a Roof?

By Apex Roofing team 9 min read

You need to plan time off, pets and parking, and one day versus three changes all of it. Find out what sets the schedule.

Apex Roofing guide to how many days a roof replacement takes and what changes the schedule.

How Long Does It Take to Roof a House?

Most residential roof replacements take one to a few days of work on the roof itself. Size, pitch, the material and any rotten decking under the old shingles decide where in that range yours lands. Permits and weather can add days before and during the job.

When people ask how long it takes to replace a roof, they usually mean the days the crew is on site. The full calendar is longer, because permits, material delivery and inspections sit on either side of the installation.

How Long Does It Take to Roof a 1,500 Sq Ft House?

Home size and roof shape set the starting point. Here is how the time on the roof typically scales:

Home and roofTypical time on the roof
About 1,500 sq ft, single story, simple roofOften one day, if the deck is sound and the weather holds
Two stories or a larger footprint, several slopesUsually two days
Large, steep or cut-up roofs, or tile and specialty materialsSeveral days or more
Size guide

Use the row closest to your home as a planning number, then check it against the factors in the next section.

What Changes a Roof Replacement Timeline?

Four things move the schedule: the size and pitch of the roof, the material, what turns up under the old shingles, and the weather. On the Front Range, weather is the one that changes plans most often.

Here is how each one moves the schedule:

Size and Pitch

Bigger and Steeper Takes Longer

More squares of roof mean more tear-off and more shingles. Steep slopes need extra safety setup and slow every task on them.

Materials

Shingles Versus Specialty

Asphalt shingles go on fastest. Tile, slate and other specialty materials are placed by hand and take noticeably longer.

Hidden Damage

What’s Under the Old Roof

Soft or rotten decking only shows once the shingles come off. Replacing it adds time, and it has to be done before anything new goes down.

Weather

Front Range Afternoon Storms

Summer thunderstorms often build in the afternoon along the Front Range. They can stop work mid-roof, and rain or snow can push the next day back.

Aerial drone view of a roof replacement project by Apex Roofing.

Weather is the one you can’t plan away, so here is what a careful crew does when it turns.

What Happens When a Storm Rolls In Mid-Roof?

A careful crew never strips the whole roof at once. It tears off one section, replaces any bad decking, and covers that section with underlayment and ice barrier before moving to the next. That way, only a small area is ever open to the sky.

When a storm builds, the crew stops tearing off and seals what’s exposed. Loose edges get fastened, and tarps go over any section that isn’t dried in yet. Work picks up once the deck is dry, so a storm costs time on the schedule, not water in the house.

What Should You Expect During a Roof Replacement, Day by Day?

Every job follows roughly the same order. Knowing it helps you book the right days off.

  1. Before day one, permit: most Colorado cities and counties require a permit before a reroof starts.
  2. Before day one, delivery: shingles and underlayment arrive, usually a day or so before work begins.
  3. Day one, protection: the crew covers landscaping, AC units and anything close to the walls.
  4. Day one, tear-off: old shingles and underlayment come off down to the deck, one section at a time.
  5. Day one, deck check: soft or damaged decking is replaced before anything new goes on.
  6. Day one, dry-in: underlayment, ice barrier and drip edge go down, so the house is protected if weather turns.
  7. Day one or two, new roof: shingles, flashing, vents, pipe boots and ridge cap are installed.
  8. Every day, cleanup: debris is hauled away and the yard is swept with magnets for stray nails.
  9. After the install, inspection: the building department inspects the work, and some cities also require an inspection partway through.

Permit and inspection requirements differ by city and county and can change. This page describes a typical sequence and is not a substitute for your local building department’s current rules.

With the sequence in mind, the days that need your attention are the ones the crew is on the roof.

How Does Apex Roofing Set Your Schedule?

Every roof replacement we take on starts with a written timeline, so you can book the days that matter before anyone climbs a ladder.

StepWhat happensWhat you get
1. Inspect and scopeYour project manager inspects the roof, photographs it in CompanyCam and writes up the scope, materials and expected days on site.A timeline in writing, not a vague window.
2. Permit and materialsWe pull the permit and schedule material delivery, then confirm your start date against the forecast.A start date you can plan around.
3. Install and close outThe crew installs and cleans up each day, and we schedule the city inspection that closes the permit.An inspected, finished roof under a 5-year labor warranty.

Because the timeline is written down first, you can book time off around real dates.

Get a Real Schedule for Your Roof

A free inspection, a written scope and the number of days your job actually needs.

Do I Need to Be Home for a Roof Replacement?

Not necessarily, but someone should be reachable by phone. You can stay in the house during the work, though tear-off is loud and the walls will shake at times.

A little preparation before the crew arrives keeps install day calm:

  • Move cars out of the driveway and garage.
  • Take pictures and mirrors off walls that share the roofline.
  • Keep pets and children inside or away from the work area.
  • Cover belongings in the attic, since dust can fall through.

With those covered, the rest of your day can go on as normal, just louder.

When Does Waiting a Few Weeks Make Sense?

If the roof isn’t leaking, there’s no need to rush into the first open date. Shingles seal best in warm weather, and a stretch of stable forecast makes for a cleaner job. For most homes, the best season for a roof replacement runs from spring through early fall.

If you do have an active leak or storm damage, waiting is the wrong call, and a temporary repair can protect the house until the replacement is scheduled.

Who Runs Your Roof Replacement From Tear-Off to Final Inspection?

As a Front Range roofing contractor, Apex Roofing schedules your install for an agreed date and our crew completes it, with the same project manager on the job from the first call through close-out. If the replacement is part of a claim, the carrier’s approvals shape the calendar too, and our roof insurance claims process keeps each of those steps in order.

GAF Certified Crews

Colorado roofing since 2010, with installation under GAF ID 1005038.

A Clean Site Every Day

Landscaping protected, debris hauled and the yard swept for nails before the crew leaves.

Permits and Inspections Handled

We pull the permit and complete the city inspections as part of the job.

Apex Roofing team members together.

One project manager, one crew and one schedule, from the first call to the final inspection.

Still Wondering How Long Your Roof Replacement Will Take?

Here are quick answers to the other timeline questions homeowners ask before booking.

How Long Does It Take to Remove and Install a New Roof?

For a typical asphalt shingle home, tear-off and installation usually happen within one to a few days. The old roof comes off in sections, and each section is dried in before the crew moves on.

Can You Stay in Your House While the Roof Is Being Replaced?

Yes. Most families stay home. Expect loud hammering during tear-off and installation, and plan to keep pets calm and cars out of the driveway.

How Disruptive Is Replacing a Roof?

It’s noisy for a day or two and busy around the outside of the house, but it rarely affects the inside. Crews protect the yard, clean up each day and sweep for nails before they leave.

How Long to Roof a House if the Decking Is Rotten?

Plan on extra time. Damaged decking has to be cut out and replaced before underlayment goes down, and how much that adds depends on how much wood is affected.

Is $30,000 Too Much for a Roof?

A number means little without the scope behind it. Roof size and pitch, the material, decking repairs, the number of layers removed, flashing, ventilation and gutters all change the price. Compare itemized estimates line by line rather than the totals.

Does the City Inspection Slow Things Down?

It can add a step. Some cities inspect partway through the job as well as at the end. Under Centennial’s residential re-roofing requirements, for example, a mid-roof inspection is required on every reroof permit once 25 to 75 percent of the new roofing is installed.

Ready to Plan Your Roof Replacement Around a Real Timeline?

Book a free inspection and you’ll get the scope, the materials and the number of days your roof actually needs, in writing. Then you can plan the rest of your week around it.

These are the pages homeowners usually read next while they plan the work.

Ready for a Free Roof Inspection?

Get a free, no-obligation roof inspection from the Apex Roofing team, serving Colorado's Front Range.

Schedule a Free Inspection